CLAUSE 38: SPECIAL RATES

The following special rates in respect of wharfage and shorehandling charges will apply, subject to the special conditions specified under each item below:-

Rate per Deadweight tonne or

Part thereof

Wharfage Shore-handling

US$ US$

1. Shipping and Landing Charges on Motor Vehicles

Motor vehicles accompanying persons proceeding

overseas or vehicles accompanying or handled on behalf

of bona fide tourist

A flat rate to cover shipping and/ or landing 12.00 12.00

or vice versa at a Tanzania Port, per vehicle

(i) Tourist must be in possession of a triptcych or carnet or to other means establishing their bona fides.

(ii) All the flat rates under this item are subject to the conditional heavy lift charges

as set out in Clause 21.

(iii) Motor vehicles with trailers shall count as 2 vehicles

2. Internal Port Traffic

Subject to a permit being first obtained from

Management, goods articles or crated animals passed

over the quays to or from such places as are situated

on the water front of the port shall be charged 2.00 2.00

Note: Shorehandling shall include cranage.

3. Discharge and Shipping of small craft overside by ship’s gear and crew.

(i) Provided a permit has been obtained from Management, no charges are due.

(ii) In the event of craft discharged overside into the harbour waters being eventually

tariff charges on imports shall Apply

(iii) Similarly any small craft placed in the water by wharf cranes shall be charged at the

normal export rates unless proof that the craft was locally made and was not for export, in which case a charge will be made only for hire of the cranes.

(iv) Heavy lift charges, where applicable shall be raised in accordance with

Clause 21.

Rate per Deadweight tonne or

Part thereof

Wharfage Shore-handling

4. Mills

Handling mail inwards or outwards per bag 0.60 0.60

5. Landing of Empty Oil Drums and Barrels 1.50 1.50

For landing of empty oil drums and barrels returned to the

Original shippers, not necessarily to the original port of

shipment, for re-export after refilling, per 1 cu. metre or part thereof.

6. Ballast

For landing or shipping of ballast per tonne of 1,000 kgs. 1.50 1.50

7. Goods Landed and Re-shipped

For goods landed and re-shipped on same vessel not covered

by import or shipping documents, per tonne. 2.50 2.50

8. SPECIAL TARIFF RATES FOR TRANSHIPMENT OF CONTAINERS AT MTWARA PORT

Up to 20ft. Over 20’.

                                                                                 US$ US$

A. CONTAINERS:

1. Stevedoring

(i) Loading and Unloading full containers 34.70 52.10

(ii) Loading and unloading Empty containers 12.50 18.60

(iii) Shifting and Restowing full containers in the

same hold 19.80 29.70

(iv) Shifting and Restowing full containers hold 24.80 37.25

to hold

(v) Shifting & Restowing Empty Containers in 9.90 19.80

the same hold

(vi) Shifting and restowing 12.50 24.80

Empty Container hold to Hold

2. Wharfage

Wharfage shall be levied 30.00 60.00

at the following rates

3. Storage

(a) Full Containers

(i) For the first 30 days after the ship

completes discharge or the container is

landed whichever shall be the earlier Free Free

Up to 20ft. Over 20ft

                                                 US$ US$

(ii) For the next 30 days 19.80 42.80

(iii) Thereafte until final Delivery 26.95 57.05

(b) Empty Containers

(i) For the first 30 days

After the ship completes

discharge or the container Free Free

is landed whichever shall be the

earlier

(ii) For the next 30 days 3.95 7.90

(iii) Thereafter until final delivery 7.90 15.85

  1. GENERAL CARGO

1. STEVEDORING

Rates per Harbour Tonne or part thereof

Regular Overtime

US$ US$

Difficult Cargo

(i) Charcoal/oil/Cake Wet Hides or Skirs/Rock

Sulphate/Sulphur/Loose timber/loose scrap 3.20 4.75

(ii) Chemicals and oils 5.85 8.90

  1. WHARFAGE

Wharfage shall be levied 1.00 per 2.00per

at the following rates HTN HTN

3. STORAGE

    1. For the first 30 days after the ship completes discharge

or the cargo is landed whichever shall be earlier Free

(ii) For the next 30 days per tonne or part thereof 0.95

(iii) Thereafter until final delivery per tonne or part thereof 1.90

Back