CLAUSE 12: HIRE OF EQUIPMENT |
|
|
|
|
|
|
|
|
|
|
|
|
When, subject to availability and convenience to Management, equipment is
hired, |
|
charges shall be raised as follows:- |
|
|
|
|
|
|
|
|
|
|
Rate per hour or part thereof |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Within |
Outside |
|
|
|
|
|
|
Port |
Port |
|
|
|
|
|
|
Area |
Area |
|
|
|
|
|
|
US$. |
US$. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Mobile Cargo handling Equipment n.o.e. |
|
|
|
|
(a) Upto and including 5 tons capacity each |
|
16 |
32 |
|
(b) Over 5 tons capacity |
|
|
20 |
40 |
|
(c) Frontloader/Side Loader - 16 tons |
|
60 |
120 |
|
(d) Frontloder/Side Loader - over 16 tons |
|
90 |
180 |
|
|
|
|
|
|
|
|
|
2 |
Mobile Cranes |
|
|
|
|
|
|
(a) Cranes of upto and including 5 tons
capacity, each |
40 |
80 |
|
(b) Cranes over 5 tons but not exceeding 10 tons
each |
60 |
120 |
|
(c) Cranes over 10 tons but not exceeding 20
tons |
80 |
160 |
|
(d) Cranes over 20 tons but not exceeding 40
tons |
100 |
200 |
|
(e) Cranes over 40 tons |
|
|
150 |
300 |
|
|
|
|
|
|
|
|
|
Note: Hire time will begin from the time |
|
|
|
|
|
the crane leaves the port. The |
|
|
|
|
|
hirer will be responsible for the |
|
|
|
|
|
drivers' overtime where worked. |
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Quay Cranes, Portal Yard and Lighter/Coaster
|
|
|
|
Wharf Cranes |
|
|
|
|
|
|
(a) Cranes of upto and including tons capacity
each |
100 |
|
|
(b) Cranes of over 5 tons capacity each |
|
120 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Within |
Outside |
|
|
|
|
|
|
Port |
Port |
|
|
|
|
|
|
Area |
Area |
|
|
|
|
|
|
US$. |
US$. |
|
4 |
Floating Cranes |
|
|
|
|
|
|
(a) For hire of cranes per hour or part thereof |
|
|
|
(Minimum charge as for two hours), each |
|
|
|
(i) Upto 60 tons capacity |
|
|
200 |
400 |
|
(ii) Above 60 tons capacity |
|
|
300 |
600 |
|
|
|
|
|
|
|
|
|
(b) In addition:- |
|
|
|
|
|
|
|
|
|
|
|
Within |
Rate
per Lift |
|
|
|
|
|
|
Port
|
Outside |
|
|
|
|
|
|
Area |
Port
Area |
|
|
|
|
|
|
|
|
|
(i) Per lift up to 20 deadweight tons |
|
80 |
160 |
|
(ii) Per lift over 20 deadweight tons |
|
120 |
240 |
|
(iii) Per lift over 60 deadweight tons |
|
170 |
340 |
|
|
|
|
|
|
|
|
|
Note: |
Hire charges for the floating cranes |
|
|
|
|
include towage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Hire of Pilot Boats |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pilot boats shall be hire per |
|
|
100 |
|
|
hour or part thereof. This rate includes |
|
|
|
|
the normal port pilot boat crew. |
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Hire of Miscellaneous Equipment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rate per Calendar Day or |
|
|
|
|
|
|
Part thereof |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Within |
Outside |
|
|
|
|
|
|
Port |
Port |
|
|
|
|
|
|
Area |
Area |
|
|
|
|
|
|
US$ |
US$. |
|
|
|
|
|
|
|
|
|
(a) Pallets, each |
|
|
|
2 |
4 |
|
(b) Tarpaulins, each |
|
|
|
20 |
40 |
|
(c) Gangways, each |
|
|
|
40 |
80 |
|
(d) Lorries for disposal or offensive,
condemned, |
|
|
|
damaged or abandoned cargo, each US$ 100.00
|
|
|
|
per lorry per trip and US$.200.00 overtime. |
|
|
|
|
|
|
|
|
|
|
|
Note: |
|
|
|
|
|
|
|
|
1 |
The charge for hire of lorry includes the cost
of labour. |
|
|
|
|
|
|
|
|
|
|
|
2 |
For equipment hiered outside the port area hire
|
|
|
|
charges are collectable in advance. |
|
|
|
|
|
|
|
|
|
|
|
|
(e) Port trailer per calendar day or Part
thereof |
100 |
200 |
|
|
|
|
|
|
|
|
|
7 |
Fire and Safety Appliances and Equipment |
|
|
|
|
|
|
|
|
|
Rate per Hour or |
|
|
|
|
|
|
Part thereof |
|
|
|
|
|
|
|
US$. |
|
(a) Appliances |
|
|
|
|
|
|
(i) Turntable Ladder |
|
|
|
20 |
|
(ii) Heavy Unit (750/1000 GPM) |
|
|
18 |
|
(iii) Major Unit 450/500 GPM) |
|
|
|
15 |
|
(iv) Portable Pumps |
|
|
|
|
13 |
|
(v) Light Van |
|
|
|
|
10 |
|
(vi) Staff Car |
|
|
|
|
8 |
|
(inclusive of minimum crew without an officer) |
|
|
|
|
|
|
|
|
|
|
|
(b) Equipment on Hire |
|
|
|
|
|
|
|
|
|
|
US$. Per Day or |
|
|
|
|
|
|
Part thereof |
|
(i) Stand Pipe and bar |
|
|
|
4.5 |
|
(ii) Fire Hose per Length |
|
|
|
4.5 |
|
(iii) Ladders (other than TL) |
|
|
|
5.5 |
|
(iv) Ropes and Lines |
|
|
|
3.5 |
|
(v) Flood Light |
|
|
|
|
3.5 |
|
(vi) Fire Extinguishers |
|
|
|
8.5 |
|
(vii) Supply of Water by bowser |
|
|
40 |
|
(inclusive of cost of water per trip) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
US$
Each |
|
(c) Testing and Repairs |
|
|
|
|
|
(i)
Test |
|
|
|
|
|
4 |
|
(ii) Patch |
|
|
|
|
4 |
|
(iii) Rewire Coupling |
|
|
|
|
4 |
|
(iv) Jointing |
|
|
|
|
4 |
|
(v) Hose Blunt Joint |
|
|
|
4 |
|
(vi) Hose Reel Test |
|
|
|
4 |
|
|
|
|
|
|
|
|